07 · Sustainability
Green from day one
Datum 05°33′N
A building's carbon is decided in the first three weeks of design. Everything after that is damage limitation. So we decide it early — and prove it later.
Certification pathways
Four routes. One standard of proof.
Select a pathway to see how we run it and what it has delivered.
EDGE
IFC's efficiency standard — the fastest credible route to certified performance in Ghana. 20% minimum savings in energy, water and materials.
- Stage 01
Preliminary modelling at concept
- Stage 02
Design certification
- Stage 03
Evidence pack on site
- Stage 04
Post-construction audit
Carbon calculator
Estimate the operational carbon you could avoid.
4,067 tCO₂e avoided over 25 years
Indicative modelling only, based on our delivered Ghanaian portfolio averages. A project-specific model is produced during feasibility.
Week one
Orientation, massing and envelope set 80% of the eventual saving.
Design stage
Continuous modelling keeps every decision inside the target.
After handover
Metered performance is reported, not assumed.