Green from day one

Datum 05°33′N

A building's carbon is decided in the first three weeks of design. Everything after that is damage limitation. So we decide it early — and prove it later.

0%
Energy reduction
0%
Water reduction
0%
Embodied carbon cut
0
Certified assets

Certification pathways

Four routes. One standard of proof.

Select a pathway to see how we run it and what it has delivered.

EDGE

IFC's efficiency standard — the fastest credible route to certified performance in Ghana. 20% minimum savings in energy, water and materials.

  1. Stage 01

    Preliminary modelling at concept

  2. Stage 02

    Design certification

  3. Stage 03

    Evidence pack on site

  4. Stage 04

    Post-construction audit

Delivered on this pathway
Energy saving achieved41%
Water saving achieved38%
Materials saving achieved24%

Carbon calculator

Estimate the operational carbon you could avoid.

Asset typology
Strategy
Conventional baseline
9,920 tCO₂e / 25 yrs
Dreamworks optimised
5,853 tCO₂e / 25 yrs
Carbon avoided41%

4,067 tCO₂e avoided over 25 years

Indicative modelling only, based on our delivered Ghanaian portfolio averages. A project-specific model is produced during feasibility.

Week one

Orientation, massing and envelope set 80% of the eventual saving.

Design stage

Continuous modelling keeps every decision inside the target.

After handover

Metered performance is reported, not assumed.