Dreamworks

06 · Technology

The digital orchestration engine

Datum 05°33′N

Five interlocking systems that turn a construction project into an instrumented, queryable, provable process.

0%
Projects modelled in BIM
0hrs
Site-to-portal data latency
0
Integrated data streams
0
Spreadsheet versions of truth

The stack

Intelligence before decoration.

Select a layer to see what feeds it, what it produces, and how it performs.

TIL.01

BIM Central Command™

One federated model per asset. Every discipline authors into it, every clash is resolved in it, every quantity is drawn from it.

Inputs
  • Survey point cloud
  • Architectural model
  • Structural model
  • MEP model
Outputs
  • Clash register
  • Quantity schedules
  • Construction sequence
  • As-built record
Measured performance
Clashes resolved pre-construction98%
Quantities taken from model100%
Rework attributable to coordination3%

Figures are drawn from Dreamworks delivery records and are restated each quarter.

How it connects

One chain, no handover gaps.