06 · Technology
The digital orchestration engine
Datum 05°33′N
Five interlocking systems that turn a construction project into an instrumented, queryable, provable process.
0%
Projects modelled in BIM
0hrs
Site-to-portal data latency
0
Integrated data streams
0
Spreadsheet versions of truth
The stack
Intelligence before decoration.
Select a layer to see what feeds it, what it produces, and how it performs.
TIL.01
BIM Central Command™
One federated model per asset. Every discipline authors into it, every clash is resolved in it, every quantity is drawn from it.
Inputs
- Survey point cloud
- Architectural model
- Structural model
- MEP model
Outputs
- Clash register
- Quantity schedules
- Construction sequence
- As-built record
Measured performance
Clashes resolved pre-construction98%
Quantities taken from model100%
Rework attributable to coordination3%
Figures are drawn from Dreamworks delivery records and are restated each quarter.
How it connects